The Opportunity

Browne & McMahon Joint Venture Pty Ltd are pleased to present a 'Pre-Owned' IPCC that has  less than 10000 Operating Hours.

In Pit Crushing & Conveying System.

We are currently seeking expressions of interest 'EOI' from from Mining Companies and Large Scale Mining Contractors who are in the market for a World Class IPCC.

Location

Currently located at Clermont Mine Central Queensland Australia.

This World Class TAKRAF IPCC is a fantastic opportunity and is ready to be disassembled and transported to Mackayor any location in Australia in a 26 week time frame.

 
 

Destination

This World Class TAKRAF IPCC could also be shipped to any country globally and recommissioned within 12 months for the astute buyer.

 History

 

This In Pit Crusher and Conveyor System was Commissioned in 2009 at the Clermont Mine in Central Queensland Australia.

At the time it was the Worlds Largest IPCC System. When new owners took possession of the mine the IPCC was decommissioned

 

System Overview

The IPCC system can crush and transfer overburden via conveyors of up to 5 km to the dump area. Reducing the number of haul trucks and expensive hauling costs.

IPCC mobile crusher can handle both ore and overburden material.

The IPCC has a proven production rate of 10,000 tonnes per hour.

Mobile Crusher and Conveyor

The IPCC can be set up in a semi-permanent location to reduce truck haul distances. It is also suitable for crushing and transporting waste or ore to a stockpile

Shovel, Conveyor Combination - SHECON

IPCC can track behind a shovel to replace an entire truck fleet, crushing and transporting the waste to the tiphead.

The IPCC Components:

 

The IPCC System is designed to crush and convey excavated overburden at a nominal mass flow rate of 10,000 tph.

The mobile and relocatable system consists of:

  • Mobile Sizing Rig (MSR)

  • Overland Ramp Conveyor

  • Overland Dump Conveyor

  • Mobile Transport Crawler (MTC)

  • Mobile Tripper and Spreader (MTS)

  • Including a significant list of Critical Spare Parts (CSP)

Example IPCC Layout:

 

Mobile Sizing Rig (MSR)

 
 


Takraf Technical Data:

 

BRF-W2-12000

Fabrication number: G018

Crusher: ABON Twin Roll 16/350 CCTD

Material to be conveyed: Overburden / Ore

Theoretical Conveying Volume: 10,000 t/h

Bulk Density: 2.4 t/m3

Max. Lump Size: 450 x 350 x 350 m

Belt Width: 2200 and 2800 mm

Apron Feeder: 3000 mm wide

Machine Weight (dry): 1560 t

Installed Power: 3985 kW

Max operating slope: 10%

Travel speed: 10 m/min

 
 
 

The Abon roll crusher (ABON 16/350CCTD) is capable of reducing overburden or ore from a top size of 1,300 mm to a nominal size of 450 mm.

The IPCC system can be set up to be semi-mobile with direct loading by shovel or semi-permanent with trucks dumping into the MSR hopper.

 

420 Tonne Mobile Transport Crawler

Specifically developed for the transport and relocation of heavy and/or over-size mining or processing plant equipment such as belt conveyor head or tail stations, conveyor structure segments, semi-mobile crushing plants, apron or belt feeders, surge bins, counterweights or any large structure or device that needs to be moved.

 
 
 
 

Overland Conveyor

TAKRAF/SKM design

Motors ABB 1350kW

 
 

The conveyor comes in modules so that the conveyor can be moved quickly, with a current total length of 4,900 m.

Approximately 10,000 m of ST4000 steel cord belt, width 2200 mm (15 mm top cover, 8 mm bottom cover) in good condition.

Designed to operate as 2 belts using 4 x 1,350 kw ABB motors using Variable Speed Drives (VSDs) capable of up to 12,000 tph.

Mobile Tripper Spreader (MTS)

 

The mobile tripper spreader can spread overburden to the dump and the conveyors and spreader moved by dozers as required.

 
 
 


Takraf Technical Data:

 

Tripper: BW1800

Spreader: A2Rs-B 7500.50

Fabrication number: G0209.10

Serial number: 1317

Material to be conveyed: Overburden / Ore

Theoretical Conveying Volume: 10,000 t/h

Bulk Density: 2.4 t/m3

Max. Lump Size: 450 x 350 x 350 m

Dump Conveyor Centre Distance: 2041m initially, then 2480 m

Lift: -3 m

Belt Width: 1800 mm

Belt Speed: 5.75 m/s

 

System Operator Controls

The entire system can be started, monitored and stopped by one operator from the operators cabin situated at the conveyor bridge of the MTS

6 Display Screens in Cabin

 
  • 1 x Scada for MTS

  • 1 x Scada for overall plant

  • 4 x CCTV screens

 

Swivel Operators Chair with Joy Stick Controls

Benefits

Environmental Benefits

  • Reduced truck numbers, haul road congestion and Improved safety due to fewer mobile vehicle usage

  • Less fossil fuel dependent using clean electrical power.

  • Reduced manning requirements of between 40 – 60% due to higher automation.

  • Reduced spare part requirements.

  • Reduced greenhouse gas emissions of up to 38%

  • Noise level reduction of up to 35%

  • Dust emission reduction of up to 40%

  • Reduced bad weather downtime

Reduced Costs compared to Hauling

  • Eliminates the need for haul road construction and on-going maintenance cost.

  • IPCC systems are reliable, requiring less maintenance and service employees than trucks.

  • Production is not impaired by bad weather.

  • Conveyors can operate on steeper grades compared to trucks.

Videos

These videos DO NOT relate to this specific IPCC and are provided for information & visualisation only.

IPCC Operations (Fully Mobile)

IPCC Operations (Semi-Mobile)

Interested?

This is a rare opportunity for the astute buyer.